Update on Certificate of Completion and Compliance (CCC) and Guide to Filling up CCC Forms |
|
|
|
Written by ACEM Secretariat
|
Monday, 26 May 2008 |
As of May 2008 Professional Engineers have issued 16 CCCs and Professional Architects have also issued about the same number.
The majority of these completed projects are for factories, warehouses, bungalows and petrol stations. Meanwhile, both BEM and BAM have set up their respective CCC Sub-Committees to deal with all issues pertaining to CCC.
Upon review of the CCC documents (Form F and Gs) received by both Boards, it is apparent that many PSPs (Principal Submitting Persons) are still not fully conversant with filling up the various forms properly and some defaulting on enclosures.
Examples of errors detected are:
- Inserting PSP’s design drawing nos. instead of Local Authority’s Approval Reference no.
- Inserting Contractor with Company Name instead of the required Individual Name with NRIC no.
- Name of Local Authority not inserted
- Wrong discipline of Professional Engineer signing as SP (Submitting Person) in Form Gs
- Non submission of Form Gs
- Non enclosure of Clearance Letters from Utilities
To eliminate this shortcoming, the CCC Sub-Committees have now prepared a comprehensive Guide to filling up CCC Forms F/F1 and G1 to G21 [see Guide to Filling CCC Forms May08], as well as samples of such completed forms [see CCC Forms BM Samples May08]. |